top of page

Glass-filled polyamide

Recycled PA6 GF30 and PA66 GF30 granules

Glass-filled polyamide for moulders, compounders and traders across Europe, stocked in Poland. Pick a grade, check its MFI and request the data sheet.

30%

nominal glass fibre

4–5 t

typical order, up to a full truck load

TDS

data sheet sent by email on request

PA GF grades

Green button: available, data sheet on request. Grey button: currently out of stock. MFI values are indicative; see the data sheet for test conditions.

Grade

Polymer

Colour

MFI

PA6 GF30 Natural RNC30

PA6

Natural

26.4

PA6 GF30 Black EBC30

PA6

Black

20.5

PA6 GF30 Black LBC30

PA6

Black

45

PA6 GF30 Natural VNC30

PA6

Natural

18.5

PA66 GF30 Black ABC30

PA66

Black

20.5

PA66 GF30

PA66

Ask sales

32

PA66 GF30 Black GS2060

PA66

Black

21.6

Questions about PA6 GF30 and PA66 GF30 granules

Who supplies glass-filled PA6 and PA66 granules in Europe?

MT Recycling Plastics, a Polish supplier of recycled plastic granules, supplies PA6 GF30 and PA66 GF30 granules in black and natural from stock in Poland to injection moulders and compounders across Europe.

Which PA GF30 grades do you have?

Glass-filled PA6 and PA66, usually in black and natural. The table above lists the grades in stock right now with their MFI, and each one has a data sheet you can request. If you need a grade that isn't listed, ask us.

PA6 GF30 or PA66 GF30: which should I choose?

Both contain about 30% glass fibre. PA66 GF30 melts at a higher temperature and keeps its stiffness better when hot, so it suits parts near engines or heat sources. PA6 GF30 is easier to process.

Do glass-filled polyamides need drying?

Yes. Polyamide takes up moisture from the air, so dry the granules before moulding. Follow the drying conditions for your grade and machine; the data sheet gives the details.

How do I order PA GF30 for delivery to Italy or Germany?

Send the grade, quantity and destination through the form below. Orders start at about 4–5 tonnes and go up to a full truck load, ex-works (EXW) Poland or delivered (DDP) to your site. A full truck load is cheaper per tonne to deliver. Loading is usually about one week after you confirm, and a free 1–10 kg sample can come first.

PA GF enquiries

Tell us the grade you need

Request a quotation

Send us the grade, quantity and destination. We reply with availability and a quote.

We reply within one working day.

Need another material?

See every grade we list on the Products page, with MFI and data sheet requests.

bottom of page